The vacuuming had to be completed between 6:00 pm and 4:00 am and the vacuum truck had to be removed from the job site at the end of each night. The project had to be started and completed while the Senate was on vacation or in recess.
The vacuuming had to be completed between 6:00 pm and 4:00 am and the vacuum truck had to be removed from the job site at the end of each night. The project had to be started and completed while the Senate was on vacation or in recess.
The Kentucky Speedway in Sparta, KY has been hosting NASCAR and ARCA racing events on its 1.5 mile track for over a decade. Over 360 squares (36,000 sq. ft.) of ballast needed to be removed from a single-ply EPDM roof.
The Center of Science and Industry in Columbus, OH (COSI) needed to remove 150 squares (15,000 sq. ft.) of River Rock from their single-ply EPDM roof.